Quck answer

To build a shower pan on a slab floor, follow these steps:

1. Measure and mark the desired shower area on the slab floor.

2. Install a shower drain in the marked area, making sure it is level with the floor.

3. Build a curb around the shower area using bricks or cement blocks.

4. Apply a waterproof membrane on the floor and up the walls of the shower area.

5. Mix and pour a layer of mortar over the waterproof membrane, sloping it towards the drain for proper drainage.

6. Use a trowel to smooth and level the mortar, ensuring it is even and free of any lumps.

7. Allow the mortar to dry completely before tiling or installing the shower base.

By following these steps, you can successfully build a shower pan on a slab floor.

A shower pan is a layer of the shower floor beneath the tile. If you’re wondering how to construct a shower pan on a slab floor, the process is complex but achievable. Proper waterproofing is essential to avoid leaks later, which requires appropriate drying and curing times.

Anatomy of a Shower Pan

A shower pan’s function is to create a sloped, waterproof seal between the shower and the flooring underneath since tile, grout, and mortar are not entirely waterproof. Building a shower pan on a concrete slab floor is ideal in many ways. Tile showers are quite heavy, considering the tiles’ weight plus the mortar and cement board backing. Some types of floors need to be reinforced to support a shower and build a shower pan on them, but with a concrete slab floor, this is not necessary.

Shower pans consist of several layers. The bottom layer is the slope fill bordered by the curb. This gently sloped fill allows the waterproof membrane above to funnel any water to the drain. Next is the waterproof vinyl or rubber pan liner, which creates the waterproof seal.

Next, a layer of galvanized metal lath may be required. Finally, more sloped mortar bed forms the last layer of the shower pan. Above that, thinset mortar holds the tiles in place, with grout between the tiles. These layers make up the shower floor, but they cannot be laid all at once. Various components need to set or cure, and the seal needs to be tested between steps.

Building the Shower Pan

Before beginning, stuff the drain with a rag to ensure no debris can enter during the building process. Then, measure the dimensions of your planned shower. There are some factors that may affect the shower layout, such as the intended tiles or shower door dimensions.

Once you’ve drawn the shower floor’s outline, you will need to build a curb. Wooden curbs are typical, but wood can wick up moisture from the concrete below or warp as it dries after installation. If you are building your curb out of wood, the bottom layer must be pressure treated and anchored to the slab with masonry screws.

Preparing the Floor Surface

Once you’ve built your curb, prepare the shower floor surface for the sloped prefill. You can begin by mixing some thinset mortar with a little more water than the instructions dictate to create a loose mix that will help the mortar or the sloped prefill bond to the slab.

The final slope of the shower needs to ascend 1/4 inch for every foot away from the drain. Plan your slope and pour the prefill accordingly. Let the mortar cure for 24 hours.

Laying the Shower Liner

Once the sloped prefill has cured, lay the waterproof shower liner. The shower liner must extend at least 8 inches up the shower walls, preferably up to 12 inches. The shower liner must also cover the curb and must do this without being cut, only folded.

It is important to only cut an X-shaped hole in the shower liner where it sits over the drain and fold the leaves of the X down into the drain. The drain hole should not be cut too large. Use nails to attach the membrane to the studs and backing at least 8 inches above the shower floor and on the outside of the curb. To help the mortar of the shower bed affix to the curb, lay steel mesh over the curb and mold it over the curb. Staple the mesh to the curb on the outside edge only, as the inside edge will be held in place by the mortar floor.

Before finishing, do a water test by filling the shower pan with water and marking the level. Leave it for 24 hours and check if the water level has lowered. If it is unsuccessful, start with a fresh sheet of liner and try again. If the waterproofing is successful, install the cement board backing around the walls to be the substrate for the tiled walls. Finally, float the mortar bed itself, which should be 1 1/4 inches thick around the drain assembly and slope 1/4 inch upward per every foot going away from the drain. Remember to leave room for the actual tiles with the drain assembly and plan the slope, taking into account the prefill one layer below. Mark the walls to the height the mortar will need to reach. Once the mortar has been shaped, let it cure. The shower pan is now complete and ready for more thinset mortar and tiling.

FAQ

1. What materials do I need to build a shower pan on a slab floor?

To build a shower pan on a slab floor, you will need the following materials: a shower pan liner, mortar mix, a trowel, a level, a drain assembly, cement backer board, waterproofing membrane, and tile adhesive. These materials will ensure a sturdy and waterproof shower base.

2. What is the process of building a shower pan on a slab floor?

The process begins by removing the existing flooring and cleaning the slab floor thoroughly. Next, the drain assembly is installed and the shower pan liner is placed over it, extending up the walls. Mortar mix is then mixed and spread evenly over the liner, creating the slope for proper drainage. Cement backer board is installed on the walls, followed by applying a waterproofing membrane. Finally, tile adhesive is applied, and the tiles are laid on the shower pan and walls.

3. How long does it take to build a shower pan on a slab floor?

The time it takes to build a shower pan on a slab floor can vary depending on factors such as the size of the shower, skill level, and the drying time of the materials used. Generally, it can take anywhere from a few days to a week to complete the entire process, including drying and curing times for the mortar, waterproofing membrane, and tile adhesive.

4. Can I build a shower pan on a slab floor without professional help?

Yes, it is possible to build a shower pan on a slab floor without professional help. However, it is important to have some knowledge and experience in construction and plumbing. Following detailed instructions and utilizing proper tools and materials is crucial for a successful DIY project. If you are unsure or uncomfortable with any steps of the process, it is recommended to consult with a professional to ensure a proper and safe installation.

5. How do I maintain and clean a shower pan built on a slab floor?

To maintain and clean a shower pan built on a slab floor, regular maintenance is necessary. Use a mild cleaner and non-abrasive scrub brush to clean the tiles and grout. Avoid using harsh chemicals or abrasive cleaners that can damage the tiles or waterproofing. Inspect the shower pan regularly for any signs of leaks or damage, and address any issues promptly. Additionally, ensure proper ventilation in the bathroom to prevent moisture buildup, which can contribute to mold and mildew growth.